翻訳と辞書
Words near each other
・ Comactinia
・ Comadia
・ Comadia albistrigata
・ Comadia alleni
・ Comadia arenae
・ Comadia bertholdi
・ Comadia dolli
・ Comadia henrici
・ Comadia intrusa
・ Comadia manfredi
・ Comadia redtenbacheri
・ Comadia speratus
・ Comadia suaedivora
・ Comadia subterminata
・ Comadre (band)
Colíder Dam
・ Colònia de Sant Pere
・ Colón
・ Colón (currency)
・ Colón (Madrid Metro)
・ Colón (Metrovalencia)
・ Colón (surname)
・ Colón C-3 F.C.
・ Colón Centro y Noroeste
・ Colón Department
・ Colón Department (Colombia)
・ Colón Department (Honduras)
・ Colón Department, Córdoba
・ Colón Department, Entre Ríos
・ Colón District


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Colíder Dam : ウィキペディア英語版
Colíder Dam

The Colíder Dam is a rock-fill dam with an asphalt-concrete core, currently under construction on the Teles Pires river about southeast of Colíder in the state of Mato Grosso, Brazil. The dam's hydroelectric power stations will have 3 turbines each 115 MW resulting in a total installed capacity of 306.9 MW. Construction on the run-of-the-river type station was initiated in May 2011, and is expected to be operational in 2015.
The dam is part of a planned six power plant "Hidrovia Tapajos/Teles Pires" project to create a navigable waterway connecting the interior of Brazil to the Atlantic Ocean.
The waterway will consist of five dams on the Teles Pires river ( Magessi Dam, Sinop Dam, Colíder Dam, Teles Pires Dam, Sao Manoel Dam) and the Foz do Apiacas Dam on the Apiacas river.
The Colíder Dam and the Teles Pires Dam are currently under construction, while the smaller upstream dams are still in the planning stages.〔(【引用サイトリンク】url=http://www.agricultura.gov.br/arq_editor/file/camaras_tematicas/Infraestrutura_e_logistica/17_reuniao/Apresentacao_CT_MAPA.pdf )
==Design==
The Colíder Dam will be a combination embankment dam with concrete sections for the power stations and spillway. The length of the entire dam will be . The dam will utilize 4.7 million cubic meters of earth and 260 thousand cubic meters of concrete, and will impound a reservoir with a surface area of 182.8 square kilometers. The power plant is being constructed by the Brazilian utility Companhia Paranaense de Energia (Copel).